Pump Station Commissioning
- Full system inspection
- Levels inspection
- Manway check for obstruction
- Mount control panel (if not in place)
- Check correct load to panel
- Check correct cable size
- Check correct power supply
- Set the overloads
- Lower pumps via guide rail onto stools using an A-frame if required
- Pull pump cables through ducting
- Pull float cables through ducting
- Set floats to correct operating position
- Wire cables into control panel
- Fill system with water
- Full test of pump station
- Sign-off and certification
- Warranty and documentation provided